![]() |
Brand Name: | Genyu |
Model Number: | GY1258A-COB |
MOQ: | 2700 pieces |
Price: | Negotiation |
Payment Terms: | T/T, Paypal, Western Union, MoneyGram, Credit Card |
Supply Ability: | 300K pcs/ Month |
HTN (High-Twist Nematic) Technology:
Blue Color:
LCD Structure:
Detailed Parameters:
NO. | ITEM | SPECIFICATIONS |
1 | Model Number | GY1258A-COB |
2 | LCD Type | HTN negative, transmissive |
3 | Viewing Angle | 12 O'clock |
4 | Drive Method |
1/4 Duty, 1/3 Bias, 5.0V
|
5 | Operating Temperature | 0~+50℃ |
6 | Storage Temperature | -10~+60℃ |
7 | Driver IC | HT1621 |
8 | Connector | COB+Zebra |
9 | Backlight | LED, white, 30mA |
10 | Module Size | 76(W)* 58(H)* 19.7(T) mm |
11 | LCD View Area | 60(W)* 32.5(H) mm |
Features | HTN Blue LCD | TN LCD |
---|---|---|
Contrast | Higher contrast, sharper image | Lower contrast, more washed-out appearance |
Viewing Angles | Better than TN, but limited | Poor viewing angles |
Backlight Color | Blue (or blue segments on dark background) | Varies (usually light background, dark text) |
Power Efficiency | Efficient, suitable for battery-powered devices | Efficient, suitable for basic applications |
Response Time | Slightly slower than TN, but not an issue for segment displays | Fast response time for dynamic content |
1. Q: What products can you provide?
A. 1) Custom Segment LCD Display;
2) Monochrome Graphic/Dot Matrix LCD Display Modules;
3) Micro OLED Display Modules;
4) Color TFT LCD Display Panels;
5) LED Backlights.
2. Q: What is the process for custom samples?
A: Send inquiry -- Offer quotation -- Confirm quotation & Pay tooling charge -- Provide drawing -- Confirm drawing -- Make tooling & samples -- Samples finished -- Delivery via freight or sea collect.
3. Q: How long can I get the custom samples?
A: Different product types will take different times. Usually, it will take about 30-35 days.
4. Q: Can I get free samples?
A: We would like to provide 3-5 pcs free samples after tooling.
5. Q: What is the minimum order quantity?
A: MOQ mainly depends on LCD sizes.
6. Q: How long is it for mass production?
A: Usually 35-45 days, it depends on your part number.
7. Q: How do you control the quality of products?
A: All products are 100% inspected before shipment.